Skip to content

DD/MM/YYYY vs MM/DD/YYYY Dates

Published 27 November 2026 · Free Date Converter editorial team

DD/MM/YYYY puts the day first. MM/DD/YYYY puts the month first. That makes 03/04/2026 either 3 April 2026 or 4 March 2026, depending on which order the source uses.

Format Date ISO date
DD/MM/YYYY 3 April 2026 2026-04-03
MM/DD/YYYY 4 March 2026 2026-03-04

Check the source before converting

  1. Look for the printed format on the form or another date in the same record. A first value greater than 12 can only be the day in these two formats.
  2. Type the date with a named month or in YYYY-MM-DD when you can. A form that requires a specific order may still need its prescribed format.
  3. If you enter an ambiguous Gregorian date on the calendar converter, read the Reading this as line. When both readings are valid, the converter offers the other interpretation.
Quick check. How would you read 14/04/2026?

14 April 2026. The first value is greater than 12, so the month must be the second value. In a month-first format the same date would be 04/14/2026.

The date’s calendar matters too. A year-first date from a Nepali record can be in Bikram Sambat. Use the BS date worksheet for a worked example in Devanagari.